Engineering Services

  • Stormwater Management System

    Site analysis for stormwater runoff assessment

    Grading, berm, and swale design

    Dry detention areas

    Subsurface stormwater detention chambers

    Palm Beach County PB-0-128 requirements

  • Site Development

    Lot filling and grading activity

    Fill and aggregate materials specification and testing

    Pavement and curbing design

    Catch basin, culvert, and underground drainage piping

  • FEMA Special Flood Hazard Area (SFHA)

    Analysis of grading work under the Base Flood Elevation (BFE)

    Stage-storage calculations

    Compensatory storage calculations and design

  • Code Compliance

    Post-construction Drainage Certificate of Compliance (Palm Beach PPM# PB0-044)

    Notice of Violation resolution services

    Building Code Violation consultation

Your Next Steps

  1. You’ve been advised that you need an Engineered Drainage Plan or a Drainage Certification

  2. You’ll send the information about your project

  3. Within 3 business days, I’ll send a proposal

  4. Upon agreement, I’ll coordinate with all those involved in your project (architect, surveyor, septic design contractor) and the permit issuing agency

  5. Within 2 weeks, I’ll provide an Engineered Drainage Plan draft for your review

  6. Within 3 business days of your review, I’ll send an Engineered Drainage Plan final for filing

Click the button below, give me a little more information, and I’ll contact you within 1 business day

Let Us Help With Your Next Project.