Engineering Services
-
Stormwater Management System
Site analysis for stormwater runoff assessment
Grading, berm, and swale design
Dry detention areas
Subsurface stormwater detention chambers
Palm Beach County PB-0-128 requirements
-
Site Development
Lot filling and grading activity
Fill and aggregate materials specification and testing
Pavement and curbing design
Catch basin, culvert, and underground drainage piping
-
FEMA Special Flood Hazard Area (SFHA)
Analysis of grading work under the Base Flood Elevation (BFE)
Stage-storage calculations
Compensatory storage calculations and design
-
Code Compliance
Post-construction Drainage Certificate of Compliance (Palm Beach PPM# PB0-044)
Notice of Violation resolution services
Building Code Violation consultation
Your Next Steps
You’ve been advised that you need an Engineered Drainage Plan or a Drainage Certification
You’ll send the information about your project
Within 3 business days, I’ll send a proposal
Upon agreement, I’ll coordinate with all those involved in your project (architect, surveyor, septic design contractor) and the permit issuing agency
Within 2 weeks, I’ll provide an Engineered Drainage Plan draft for your review
Within 3 business days of your review, I’ll send an Engineered Drainage Plan final for filing
Click the button below, give me a little more information, and I’ll contact you within 1 business day